Three-Station Lamp Production And Assembly Equipment Assembly Line SolidWorks

1
Published by: Elmer Barfield

This is a set of non-standard equipment for the production of headlights, which can be assembled by electric and pneumatic drive and manual work. (However, it is possible to produce other lamp products by changing the tightening tooling and running PLC, which is a very good reference material for designing lamp assembly equipment.

ST09 station operation process description: 1. take the semi-finished products to the corresponding tooling, clamping tooling to lock the products.
2. take the fixing screws to install to the lamp housing.
3. Take the semi-transparent film and gasket and install them into the lamp housing.
4. Go down the model and put it into the next station.

ST12 workstation operation process description: 1. take the product and put it on the tooling.
2. inspecting the appearance, cleaning and spotting.
3. Wrap the protective film.
4. Scan label information.
ST13 workstation operation process description: 1. Take the product and put it on the workbench.
2. detecting appearance, lighting and puncturing.
3. boxing.
4. Go to the barcode printer to paste the whole box barcode on the whole box package.

Specification: Three-Station Lamp Production And Assembly Equipment Assembly Line SolidWorks

Design Software

Version

File Formats

, ,

Editable

Sharing Level

User Reviews

0.0 out of 5
0
0
0
0
0
Write a review

There are no reviews yet.

Be the first to review “Three-Station Lamp Production And Assembly Equipment Assembly Line SolidWorks”

Three-Station Lamp Production And Assembly Equipment Assembly Line SolidWorks
Three-Station Lamp Production And Assembly Equipment Assembly Line SolidWorks
Mechanical Engineering Design Library
Logo
Shopping cart