PA40 (Sunroof OFFLINE Sunshade Shaft Pre-Assembly Station) SolidWorks

1
Published by: Tevin Swann

Register to Download
Just 2 Minutes

The second sequence: using equipment: rocker drill

machining parts: two three-dimensional holes;

clamping principle:

using the first sequence of processing the mounting joint surface as the device surface, F-F view of the two 2-??8 pin holes centering, one side of two pins; ;

Specification: PA40 (Sunroof OFFLINE Sunshade Shaft Pre-Assembly Station) SolidWorks

Design Software

Version

File Formats

,

Editable

Sharing Level

User Reviews

0.0 out of 5
0
0
0
0
0
Write a review

There are no reviews yet.

Be the first to review “PA40 (Sunroof OFFLINE Sunshade Shaft Pre-Assembly Station) SolidWorks”

PA40 (Sunroof OFFLINE Sunshade Shaft Pre-Assembly Station) SolidWorks
PA40 (Sunroof OFFLINE Sunshade Shaft Pre-Assembly Station) SolidWorks
Mechanical Engineering Design Library
Logo
Shopping cart