Dual Power Supply Switchgear Distribution Cabinet SolidWorks

1
Published by: Brandyn Baldwin

Register to Download
Just 2 Minutes

The fourth sequence: using equipment: VMC850 (the same as the first sequence)

Machining part: after installing the other half of the shaft tile on the E datum surface, machining C and D datum holes, end faces and the associated features of the tab surface;

Clamping principle:

Using the installation bond surface machined in the first sequence as the device surface, the F-F view of the Two 2-??8 pin holes for centering, two pins on one side;

Program requirements:

Two pieces in one clamping: the first one (first station) for C datum and related features; the second one (second station) for D datum and related features, one tool for fine boring C and D datum (shank hole), no interference with the tool in the middle cavity

Specification: Dual Power Supply Switchgear Distribution Cabinet SolidWorks

Design Software

Version

File Formats

,

Editable

Sharing Level

User Reviews

0.0 out of 5
0
0
0
0
0
Write a review

There are no reviews yet.

Be the first to review “Dual Power Supply Switchgear Distribution Cabinet SolidWorks”

Dual Power Supply Switchgear Distribution Cabinet SolidWorks
Dual Power Supply Switchgear Distribution Cabinet SolidWorks
Mechanical Engineering Design Library
Logo
Shopping cart