Cell Phone Charger Plug Automatic Test Line SolidWorks
Cell phone charger since the conductive test equipment 3D model, this is a fully automatic cell phone charger automatic testing production line, energized test is through the head of the probe on the charger plug point to point test, this line is mainly divided into five major components, the first thing you can see is the forefront of the automatic loading followed by pick and place the material robot, and automatic transport multiplier sprocket then 90 degrees automatic turning conveyor belt finally is SW design source files are shared and editable!
Cell phone charger since the conductive test equipment is mainly divided into seven major parts are: loading station, automatic conveyor belt, handling robot, USB test station, plug charging test station, the next station, conveyor belt, etc., the entire production process for the unmanned operation is the most practical equipment in the current automation industry, so the whole line in which there are many structures is very good, definitely worth having!
User Reviews
Be the first to review “Cell Phone Charger Plug Automatic Test Line SolidWorks”
You must be logged in to post a review.
There are no reviews yet.